PDA

View Full Version : Work on the TF2 road connecting the two motorways should be finished by 2012



bonitatime
05-09-2011, 12:09
http://www.eldia.es/2011-09-05/tenerife/2-obras-carretera-TF-terminaran-finales.htm

Santa Cruz de Tenerife, EFE The work on the conection betweeen the north and south of the island the TF 2 could be finished at the end of 2011, according to Cabildo Road minister, José Luis Delgado.

Get rid of the pavements, resurface, tidy everything up and solve the drainage difficulties which occur on the second most used road on the island with 71.583 vehicles per day are the things which need to be done before the end of the year.

The counciller applauded the removal of the pavements, somethng he had demanded when he was in oposition, as this means that cars would have somewhere to stop if they break down.

As well, he refered to the sipperyness of the read on days that it rains, as the steep slope means that the rain runs fast down the road without a chance to be absorbed.

Delgado insisted on the importance that the TF2 will have once the Canarian givernment finished the work on the bridge to the industrial estate in Mayorazgo which will connect to Hoya Friaand add a fast conection between the two main road.

With this act the TF2 will attract more traffic, added the counciller, who because of this defended the security of the work and the tidying up that will also be done.